[Home]


Various

The following collection of videos are on various techniques, demonstrated by ProModel experts.

Calculate and Display Cycle Time and Average Cycle Time

Calculate and display the cycle time and average cycle time for entities.

Check Time of the Day / 24 Hour Clock Functionality

Check the time of day and execute logic at a specified time of day.

Experiment With Different Arrays

Run scenarios on different imported array files.

Export All Variable Value Changes to an Array

Export all variable value changes to different cells in an array.

How To Change Shift Files With Macros And Scenarios

Experiment with different shift files without having to manually change shift definitions every time you simulate your model.

How to Adjust the Conveyor Length

Learn how you can adjust the conveyor length in ProModel.

How To Calculate Total Location / Equipment Usage Time

Calculate the total time a location or piece of equipment is being used to process entities.

Import Distribution Strings From an Array / Excel

Import distribution strings from an Array / Excel spreadsheet into ProModel.

Location Units as a Scenario Parameter

Since ProModel doesn't allow you to use a macro name (or scenario parameter) in the units field of the location table, you can use called downtimes, a macro, a subroutine, and initialization logic as described in this video to enable the scenario functionality.

Preemptive Location Downtimes & Preemptive Process Records

If you have a location that has a preemptive downtime and the downtime occurs while an entity is in process, we show you how to create a preemptive processing record to route the in-process entity to another location to finish processing for the time remaining.

Routing To a Specific Location Unit

Learn how to route to a specific unit of a multi-unit location.

Varying Move Time

Vary the amount of time it takes a resource or entity to move.

© ProModel Corporation 
556 East Technology Avenue • Orem, UT 84097  Support: 888-776-6633