In this set of videos, ProModel experts demonstrate how to perform certain techniques involving model entities.
|
Control the number of entities that are allowed into a location or are made up of multiple locations using a variable as a gate. |
|
Model a situation where a customer decides to exit the system, because their wait time is too long. We use a call center model for the example. |
|
Learn how you can disable an entity arrival record in the scenario manager. |
|
Higher priority entities can preempt lower priority entities out of a location. In this example we use an emergency room with severely injured patients. |
|
Move entities throughout your model based on their priority. |
|
Learn how to accumulate a variable number of entities. |
|
Calculate the total time a location or piece of equipment is being used to process entities. |
|
Control the flow of entities from one location to another using a variable and some operation logic. |
|
Imagine the conveyor as a path along which "resources" carry the entity. Learn how to stop along the path for loading purposes. |
|
Capture the same resource that an entity had previously used. |
|
Learn how to use alternating resources to load entities and move them to different locations. |
|
Fix the problem of leftover entities. |
|
Open another location, if entities are backed up. We use a grocery store line model example. |
|
Explore how to begin a simulation with entities already in locations. |
|
This video explains a technique for regrouping a batch of entities, if they must be separated for processing. |
|
Unload entities at different locations, depending upon an attribute value assigned to the entity. |
|
Examine how to both unload and group entities at the same location. |
|
© ProModel Corporation 556 East Technology Avenue • Orem, UT 84097 Support: 888-776-6633 |