Activity Name |
Properties to Modify |
Op 10 Clean and Prep |
Time: 35
|
Op 20 Vacuum Bake | Time: 180
Batching: Before Activity: Batch: Batch Size 5 |
Op 30 Install PCB |
Time: 40
|
Op 40 Inspect and Test | Time: 0 (The actual time for this activity
will be added in the Logic Field, which is described in the next topic.)
In Buffer: 8 Hourly Cost: 17.5 (we will track only the cost associated with Inspection) |
Op 45 Rework | Time: 90
Resource: Rework Op |
Op 50 Record Unit Statistics | Time: 5
Resource: Inspector |
Back to Define Shape Properties